Massey Bridge advances to bidding stage with three groups

$3.5 billion toll bridge to be long-term private-public partnership

The transportation ministry is advancing to the request for proposal stage with three groups that will bid to build the planned $3.5-billion new bridge and Highway 99 upgrades to replace the Massey Tunnel.

The three groups of partnered companies in the running are:

– Gateway Mobility Solutions, which includes ACS Infrastructure Canada and Aecon Concessions, along with Dragados and Flatiron Constructors as design-build contractors.

– Lower Mainland Contractors, which includes Kiewit Canada, Macquarie and VINCI Concessions.

– Pacific Skyway Partners, which includes Fluor Canada, John Laing Investment and SNC-Lavalin Capital.

The winning bidder, to be chosen by next summer, is to raise $750 million to partly finance the project, as well as design, build and operate it.

The new 10-lane toll bridge is being designed to last 125 years and meet modern earthquake standards, which the Massey Tunnel does not.

The 10 lanes over the bridge will consist of four for general travel and one transit/HOV lane in each direction.

The project also includes the widening of 24 kilometres of Highway 99 to provide transit/HOV lanes from Bridgeport Road to Highway 91, replacement of three interchanges at Westminster Highway, Steveston Highway and Highway 17A, decommissioning of the tunnel, and construction of multi-use pathways for cyclists and pedestrians on either side of the new bridge.

The new bridge is supposed to open in 2022.

The Metro Vancouver regional district has opposed the project as it stands, arguing the bridge’s 10 lanes is excessive and will cause undesired impacts on growth, steer more people into cars instead of public transit, and ultimately increase congestion.

The B.C. government originally tried to build the Port Mann/Highway 1 project as a full public-private partnership but cancelled the finance component in 2009 in the midst of the financial crisis and borrowed directly to get the new bridge built.

Model of the future Steveston Highway interchange after the Massey Bridge/Highway 99 project is complete.

Just Posted

Surrey wants BNSF to slow Crescent trains

Mayor Linda Hepner said ‘it’s the least we can do’

Rail-safety forum planned for White Rock this Friday

Event to include municipal, federal, provincial governments

White Rock open house to discuss city’s aquifer protection plan

Examination of potential hazards includes increased population, climate change

‘Connecting Threads’ and more in Surrey Art Gallery’s fall shows

Free admission at opening reception and panel discussion Sunday afternoon

SFU unveils new lab at Surrey Memorial Hospital

Combination of MRI, MEG allows for ‘best possible windows’ intro brain function

B.C. RCMP turn to Const. Scarecrow to shock speeders into slowing down

New addition will watch over drivers from a Coquitlam median for first-of-its-kind pilot in Canada

B.C. home to 1/3 of Canada’s overdose deaths in first 3 months of the year

There were 1,036 overdose deaths in the first three months of the year, with 94 per cent accidental

B.C. candidate moves from hospice care to council race

He beat terminal cancer twice and entered hospice when he decided to run for council.

Canadian tobacco exec pushes back against vaping health concerns

A warning from Interior Health about the unknown health risks of vaping is getting a partial rebuke

New ‘meowyoral’ race featuring felines announced by B.C. animal shelter

Organizers hope the cat election will generate attention for shelter and local municipal election

Ministry of Agriculture commits $300,000 to help B.C. farmers obtain land

B.C. Land Matching Program supports access to affordable farmland for young farmers

Canadian air force short 275 pilots

Attrition outpaces recruitment and training claims Air Force

Teacher suspended after physically shushing, saying ‘shut up’ to student

Grade 5 student reported feeling ‘confused and a little scared’

Most Read