Natural Gas Minister Rich Coleman

Nisga’a Nation signs on to LNG project

Benefit agreement clears way for PETRONAS LNG project, pipeline through Lava Bed Park, with more terminals possible

A $6 million benefit agreement with the Nisga’a Nation to build a gas pipeline through its territory is the first of a series of deals that will share benefits of liquefied natural gas development with B.C. First Nations, Aboriginal Relations Minister John Rustad says.

Rustad and Natural Gas Development Minister Rich Coleman signed the agreement Thursday with Nisga’a Nation President Mitchell Stevens to accommodate a pipeline through Nisga’a territory to an LNG export facility proposed near Prince Rupert.

The pipeline is proposed by TransCanada Corp. to supply gas from northeast gas fields to an export facility at the Port of Prince Rupert. But the Nisga’a have aspirations to go beyond one project.

The Nisga’a government has identified four sites near the mouth of the Nass River that have level land and ship access that could accommodate land-based or floating LNG terminals.

“We’re not interested in a pipe that comes from the northeast and brings raw resources to the coast,” Stevens said. “What we are interested in is a pipe that gives us an opportunity to provide for an economic base for Nisga’a citizens. And these are the sites that were identified, which we own in fee simple.”

The Prince Rupert proposal is led by Malaysian energy company PETRONAS, which is expected to be one of the first of more than a dozen LNG proposals to make its final investment decision.

The B.C. and Nisga’a legislatures are changing legislation to allow a gas pipeline to pass through Nisga’a Memorial Lava Bed Park, the first provincial park to be co-managed with an aboriginal community.

The B.C. government has also proposed legislation to give the Nisga’a government taxation authority over natural gas facilities in their territory.

The Nisga’a government has also made an agreement for a still-undetermined share of $10 million in annual benefits from the TransCanada pipeline.

Stevens said there was opposition within the community to the pipeline proposal, but after an extraordinary debate where all Nisga’a hereditary leaders addressed the elected legislature, the project was approved by a two-thirds majority.

“The opportunity to be an active player in the LNG industry is the kind of opportunity for which our elders struggled for over a century, so we could achieve sustainable prosperity for our people  into the next century,” Stevens said. “Our elders have told us, now is the time to be bold and move forward.”

 

Surrey North Delta Leader

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Police watchdog finds cops blameless for deaths in 2019 Surrey hostage-taking

Woman was killed as ERT officers fired on man holding a knife to her throat and ‘what appeared to be’ a gun in his hand

Surrey’s two largest hotels are now closed due to COVID-19; room bookings plummet elsewhere

Guildford’s 77-room Four Points property remains open with ‘minimum amount of business,’ GM says

Some Surrey landlords ‘kicking out’ businesses that can’t make rent

Surrey Board of Trade CEO suspects situation will be worse in May

UPDATE: Catalytic converters stolen from four ambulances being repaired in Delta

The thefts were reported on March 31, and police say they have no suspects at this time

First Nations, remote communities need special attention in pandemic, Freeland says

Health-care workers, seniors, Indigenous Peoples some of people most at risk, health officials say

BC Hydro offers three-month bill ‘holiday’ for those affected by COVID-19

Industrial customers can defer half of their power bills

VIDEO: Dog missing in Lower Mainland since winter sees his family again for the first time

Aldergrove helped find Buster, says dad, who has now witnessed ‘the power of social media’

Some April Fool’s Day jokes bring much-needed laughter; others tone deaf to COVID-19

Police are warning the public not to use the ongoing pandemic as a punchline

Canada’s 75% wage subsidy is coming, but not for several weeks: finance minister

Subsidy will cost Canada $71 billion, but push down cost of emergency benefit, Morneau said

Call before you dig into spring projects during isolation: BC 1 Call

BC 1 Call gives free checks for utilities in the area of a desired outdoor project

B.C.’s intersection speed cameras putting more tickets in the mail

One Nanaimo location delayed after speed limit reduced

Update: Coquihalla re-opens, after incident requiring a medevac

DriveBC warns of continued delays and congestion

B.C. records five new COVID-19 deaths, ‘zero chance’ life will return to normal in April

Province continue to have a recovery rate of about 50 per cent

Most Read