The province is considering two options to replace the aging George Massey Tunnel: an eight-lane immersed tube tunnel and an eight-lane bridge. (Province of British Columbia images)

The province is considering two options to replace the aging George Massey Tunnel: an eight-lane immersed tube tunnel and an eight-lane bridge. (Province of British Columbia images)

Province receives business case for new Massey Crossing

Case to be made public after ministry decides which option — bridge or tunnel — will be built

The province is inching closer to making a decision on the new Massey Crossing, more than three years after preliminary construction work was halted by the minority NDP government.

On Thursday morning (Dec. 17), Minister of Transportation and Infrastructure announced it had received the business case for a proposed replacement of the aging George Massey Tunnel.

Detailed in the business case are the two shortlisted options presented to the public in February and March of this year: an eight-lane bridge and an eight-lane immersed tube tunnel. The government will review the submission and consult with partners and stakeholders before making a decision regarding which option will be built. The business case will be made public following that decision.

According to a technical analysis completed in December 2019, both the tunnel and the bridge options would have similar grades, include dedicated bus-only lanes and separated multi-use pathways for pedestrians and cyclists. Both options also come with comparable price tags — $4-5 billion for the tunnel and $3.5-4.5 billion for the bridge.

The immersed tube tunnel option, which was endorsed by Metro Vancouver’s board of directors in November 2019, would be about one kilometre longer and three metres deeper than the existing tunnel (to accommodate taller vehicles including double-decker buses), and located 42 metres upstream of the current structure to minimize property impacts, as well as reduce scouring at the existing GVRD water tunnel and avoid the location of a potential future BC Hydro transmission line, both of which are downstream.

The tunnel option would be a shorter crossing than the bridge and the project would also provide improved connectivity with Deas Island Regional Park.

The project would have in-river impacts during construction, however the analysis notes there is the potential for in-river habitat enhancements as well.

It’s estimated the environmental review for the tunnel option would take three years and construction would take five years, plus an extra year to close the portals of the existing tunnel and recommission it for “utility only” use. However, the report also notes that work in the river is likely to be limited to a six- or seven-month window each year, meaning if construction falls behind then critical path items could be delayed by six months or potentially even a year.

(Story continues below video)

The bridge option would be located 25 metres upstream of the current tunnel, stand 650 metres above the Fraser River and 380 metres above Deas Slough. With its suspended main section, the bridge would not require any piers in the Fraser River but would require them in Deas Slough.

The bridge would have more land-side property impacts than the tunnel option, including in Deas Island Regional Park, including long-term noise, light, visual and shading effects.

The environmental review for the bridge option is estimated to be shorter than the tunnel option, only one to two years, with the same five-year time frame for construction and additional year to close the portals of the existing tunnel and recommission it for “utility only” use.

(Story continues below video)

In the meantime, work continues on a $40-million suite of safety improvements to the Massey Tunnel.

Projects include resurfacing and line painting on Highway 99 between Steveston Highway and the Highway 17 Interchange (completed in November 2019); improving drainage to reduce pooling water and ice on the road at tunnel entrances; converting tunnel and roadway lighting to the LED standard to increase visibility and better illuminate the tunnel, as well as save energy and reduce greenhouse gas emissions; and upgrading the fire alarm, fire door, ventilation and electrical systems to ensure reliability and ongoing safety within the tunnel. Additional washing of the interior tunnel is also ongoing.

These additional safety improvements are scheduled to be complete by spring 2021.

More information on the project, including public engagement and technical work, is available at masseytunnel.ca.



editor@northdeltareporter.com

Like us on Facebook and follow us on Twitter

DeltaTransportation

Just Posted

The leadership team at Johnston Heights Secondary is looking to raise money for the Canadian Cancer Society through the Relay for Life, planned as an online and in-person event (following COVID-19 restrictions) for the week of June 1 to 7.
Pushed back a year, Surrey students well on their way to Relay for Life fundraising goal

Johnston Heights Leadership Team aims to raise $6,500 for Canadian Cancer Society

Surrey RCMP in the 4900-block of 148th Street, a short road just off of King George Boulevard, on May 15, 2021 after a male was allegedly assaulted with a “pipe-like” weapon that morning. (Photo: Shane MacKichan)
Surrey RCMP investigating after person reportedly injured with ‘pipe-like’ weapon

Police investigating incident in the 4900-block of 148th Street

The Independent Investigations Office of BC (IIO) (File Photo)
Police watchdog investigating after man found dead in South Surrey following a wellness check

IIO says officers ‘reportedly spoke to a man at the home before departing’

Surrey Fire Service battled a fire at an apartment building in Fleetwood late Friday night (May 14), near 84th Avenue and 160th Street. (Photo: Shane MacKichan)
UPDATE: Surrey firefighters continue to work to put out ‘stubborn’ fire

Four-storey building located at 84th Avenue near 160th Street; crews on scene for nearly 12 hours

Daily confirmed COVID-19 cases reported to B.C. public health, seven-day rolling average in white, to May 12, 2021. (B.C. Centre for Disease Control)
B.C. preparing ‘Restart 2.0’ from COVID-19 as June approaches

Daily infections fall below 500 Friday, down to 387 in hospital

The warm weather means time for a camping trip, or at least an excursion into nature. How much do you know about camps and camping-related facts? (John Arendt - Summerland Review)
QUIZ: Are you ready to go camping?

How many camp and camping-related questions can you answer?

On Friday, May 14 at Meadow Gardens Golf Club in Pitt Meadows, Michael Caan joined a very elite club of golfers who have shot under 60 (Instagram)
Crowds at English Bay were blasted with a large beam of light from an RCMP Air-1 helicopter on Friday, May 14. THE CANADIAN PRESS/Marc Grandmaison
Police enlist RCMP helicopter to disperse thousands crowded on Vancouver beach

On Friday night, police were witness to ‘several thousand people staying well into the evening’

People shop in Chinatown in Vancouver on Friday, February 5, 2021. THE CANADIAN PRESS/Jonathan Hayward
Vancouver community leaders call for action following 717% rise in anti-Asian hate crimes

‘The alarming rise of anti-Asian hate in Canada and south of the border shows Asians have not been fully accepted in North America,’ says Carol Lee

Sinikka Gay Elliott was reported missing on Salt Spring Island on Wednesday, May 12. (Courtesty Salt Spring RCMP)
Body of UBC professor found on Salt Spring Island, no foul play suspected

Sinikka Elliott taught sociology at the university

The first Black judge named to the BC Supreme Court, Selwyn Romilly, was handcuffed at 9:15 a.m. May 14 while walking along the seawall. (YouTube/Screen grab)
Police apologize after wrongly arresting B.C.’s first Black Supreme Court Justice

At 81 years old, the retired judge was handcuffed in public while out for a walk Friday morning

Dr. Steve Beerman, of Nanaimo, shows off his Dr. David Bishop Gold Medal, awarded for distinguished medical service. (Karl Yu/News Bulletin)
Queen presents Vancouver Island doctor with award for global drowning prevention

Dr. Steve Beerman receives Royal Life Saving Society’s King Edward VII Cup at virtual ceremony

Former UFV Cascades wrestling coach Arjan Singh Bhullar is now the ONE heavyweight champion after defeating Brandon Vera via TKO in round two on Saturday in Singapore. (ONE Championship)
Former UFV wrestling coach wins MMA championship

Arjan Singh Bhullar captures ONE heavyweight title, first Indian origin fighter to achieve honour

Most Read