The lot, located at 18611 72 Avenue, is just east of Salish Secondary and across the street from the future Clayton Community Centre. (Google Maps)

Second multi-townhouse development planned for Clayton neighbourhood

Two developments, for 83 and 95 townhouses each, would bracket new Salish Secondary school

A proposal to build 83 townhouse units on a three-acre lot in Clayton passed third reading at a public hearing on Monday night (July 23).

The lot, located at 18611 72 Avenue, is approximately 650 metres southeast of a proposed 95-townhouse development that also passed third reading at council Monday night. It is just east of Salish Secondary School, and across the street from the future Clayton Community Centre.

The proposal complies with the West Clayton Neighbourhood Network Plan (NCP) land use designation, but would require an amendment to allow it to alter a road network and biodiversity conservation strategy for that area. The developer wishes to retain an existing Class B watercourse in its current location — the NCP proposes to relocate the watercourse. A change would be needed to the road network plan to accommodate that retention.

A report presented to council by city staff noted that leaving the watercourse where it is currently located “is considered better from a habitat preservation perspective.”

Approving the project requires rezoning the site from one acre residential to multiple residential. An existing single family home and “accessory structure” would be demolished, and all 43 existing trees would be removed. The proposal provides for 78 replacement trees.

The developer plans to divide the current lot in two, to allow the development of 83 townhouses in separate stratas. The north lot would have 38 units, and the south lot would have 45 units.

A future road — 72A Avenue — would bisect the two developments. The north lot, with 38 units, would have 84 parking stalls, and the south lot, with 45 units, would have 99 parking stalls.

The proposal exceeds requirements for outdoor amenities in both lots, and indoor amenities on the south site. No indoor amenity area is proposed for the north site, and the applicant would be required to pay $45,600 — $1,200 per unit — to address that shortfall.

It is projected that the development would add 21 students to Clayton Elementary and 11 students to Salish Secondary.

According to the developer, the townhouses would be expected to be ready for occupancy by 2020.



editor@cloverdalereporter.com

Like us on Facebook and follow us on Twitter

Just Posted

OUR VIEW: Let’s find Surrey pellet-gun punks

Those who do have information – if they are also possessed of a conscience – must contact police

Coldest Night an event for warm hearts

Sources’ White Rock event one of 130 walkathons across Canada on Feb. 23

VIDEO: A new Hive climbing/fitness facility coming to Surrey in 20,000-sq.-ft. space

‘Bouldering’ and other activities planned at site near Pattullo Bridge

MK Delta Lands development another step closer to breaking ground

Delta needs Metro Vancouver’s okay before swapping hundreds of acres and adding it to Burns Bog

Guatemala mission offers hope, health

Peninsula team to visit remote villages, build a home, in Piedra Blanca

VIDEO: Canada’s flag turns 54 today

The maple leaf design by George Stanley made its first appearance Feb. 15, 1965

Eight cases of measles confirmed in Vancouver outbreak

Coastal Health official say the cases stem from the French-language Ecole Jules Verne Secondary

Prominent B.C. realtor says he doesn’t know how child porn got on his computer

Closing arguments heard in Ian Meissner’s Chilliwack trial for accessing, possessing child porn

Plecas won’t run in next election if B.C. legislature oversight reforms pass

B.C. Speaker and Abbotsford South MLA says he feels ‘great sympathy’ for Jody Wilson-Raybould

Workshop with ‘accent reduction’ training cancelled at UBC

The workshop was cancelled the same day as an email was sent out to international students

Former B.C. premier Gordon Campbell accused of sexual touching

Accuser went to police, interviewed by Britian’s Daily Telegraph

Avalanche control planned tomorrow on Highway 1

The highway will be closed in the morning east of Revelstoke

Judge rules Abbotsford home must be sold after son tries to evict mom

Mom to get back down payment and initial expenses

Mayors approve SkyTrain extension to UBC

Next step is a business plan and public consultation

Most Read