The lot, located at 18611 72 Avenue, is just east of Salish Secondary and across the street from the future Clayton Community Centre. (Google Maps)

Second multi-townhouse development planned for Clayton neighbourhood

Two developments, for 83 and 95 townhouses each, would bracket new Salish Secondary school

A proposal to build 83 townhouse units on a three-acre lot in Clayton passed third reading at a public hearing on Monday night (July 23).

The lot, located at 18611 72 Avenue, is approximately 650 metres southeast of a proposed 95-townhouse development that also passed third reading at council Monday night. It is just east of Salish Secondary School, and across the street from the future Clayton Community Centre.

The proposal complies with the West Clayton Neighbourhood Network Plan (NCP) land use designation, but would require an amendment to allow it to alter a road network and biodiversity conservation strategy for that area. The developer wishes to retain an existing Class B watercourse in its current location — the NCP proposes to relocate the watercourse. A change would be needed to the road network plan to accommodate that retention.

A report presented to council by city staff noted that leaving the watercourse where it is currently located “is considered better from a habitat preservation perspective.”

Approving the project requires rezoning the site from one acre residential to multiple residential. An existing single family home and “accessory structure” would be demolished, and all 43 existing trees would be removed. The proposal provides for 78 replacement trees.

The developer plans to divide the current lot in two, to allow the development of 83 townhouses in separate stratas. The north lot would have 38 units, and the south lot would have 45 units.

A future road — 72A Avenue — would bisect the two developments. The north lot, with 38 units, would have 84 parking stalls, and the south lot, with 45 units, would have 99 parking stalls.

The proposal exceeds requirements for outdoor amenities in both lots, and indoor amenities on the south site. No indoor amenity area is proposed for the north site, and the applicant would be required to pay $45,600 — $1,200 per unit — to address that shortfall.

It is projected that the development would add 21 students to Clayton Elementary and 11 students to Salish Secondary.

According to the developer, the townhouses would be expected to be ready for occupancy by 2020.



editor@cloverdalereporter.com

Like us on Facebook and follow us on Twitter

Just Posted

Fire destroys home in Surrey

Crews called at 3 a.m. Sunday for a residential house fire on the 12000-block of 100 Avenue

Alzheimer’s Society launches helpline

Toll-free phone line available for people with dementia and their caretakers

Art show to be held at White Rock’s Jan’s on the Beach

Art to be displayed until the end of December

New detox centre opens in South Surrey

WhiteRock EHN opened in response to opioid crisis

Saving salmon: B.C. business man believes hatcheries can help bring back the fish

Tony Allard worked with a central coast First Nation to enhance salmon stocks

VIDEO: Vancouver Giants couldn’t find the net: coach

Even with a six-on-three advantage, the Langley-based hockey team couldn’t earn points Sunday.

High-end B.C. house prices dropping, but no relief at lower levels

But experts say home ownership remains out of reach for many for middle- and lower-income families

Worker killed in collision at B.C. coal mine

Vehicle collision occurred at approximately 10:45 a.m. this morning

UPDATE: Hells Angels on scene after body found in Maple Ridge

Body was discovered beneath the Golden Ears Bridge

Mountie left with ‘significant’ injuries after driver attempts to flee traffic stop

Richmond RCMP are looking for a dark coloured Mercedes Benz

B.C. asking for tips on ‘dirty money’ in horse racing, real estate, luxury cars

Action follows a Peter German report on money laundering in B.C. casinos

Canadian dead more than a week after plane crash in Guyana: Global Affairs

Global Affairs said it couldn’t provide further details on the identity of the Canadian citizen

Children between 6 and 9 eligible for $1,200 RESP grant from province

BC Ministry of Education is reminding residents to apply before the deadline

Most Read