White Rock resident Jacqueline Lewis has raised pedestrian-safety concerns related to 16 Avenue. (Aaron Hinks photo)

South Surrey crosswalk at 16 Avenue and 152 Street delayed

City officials say ‘everyone wants to see it go ahead,’ 16 months after senior’s fall

The construction of a pedestrian-controlled crosswalk at 152A Street and 16 Avenue has been delayed, however, the City of Surrey indicated that the project still remains a priority.

Pedestrian safety at the intersection has been a point of concern for White Rock resident Jacqueline Lewis after she helped a bloodied 74-year-old woman across 16 Avenue last year.

In July 2018, Elke Donschenko tripped on a gravel patch in White Rock, breaking her wrist and fracturing her finger. Lewis, along with another woman, helped Donschenko cross 16 Avenue, which Lewis described as dangerous due to motorists not slowing down.

RELATED: White Rock senior breaks wrist after tripping on gravel patch

Lewis, who lives in the neighbourhood and regularly crosses the street with her husband to access the Abby Lane Health Centre, said she frequently watches people “dodge” traffic to cross the road.

She also expressed concern for elderly residents with mobility issues who have to walk to the nearest pedestrian-controlled intersection, which is at 152 Street and 16 Avenue.

Last year, the City of Surrey emailed Lewis saying that the 152A intersection has been “flagged” for the installation of a pedestrian-controlled signal and that it was anticipated to be built this year.

Lewis has been in email communication with both City of White Rock and Surrey throughout the year and told Peace Arch News this week that she has been receiving the “runaround” from both municipalities as to why construction has not yet been started.

Although there was a “hiccup” with securing a permit from the City of White Rock to install the pedestrian light, City of Surrey transport engineer Katarina Stevovic said the project is now in the hands of the contractor.

Stevovic explained Monday that the project was bundled with other contract work, which helps the city receive a “favourable” price on the work.

“And then it’s up to the contractor to go through and schedule all their work,” Stevovic said. “The work has been tendered, we’ve ordered the contract.”

The hiccup, Stevovic said, related to the City of White Rock turning down a permit filed by the contractor, as the intersection shares borders with White Rock.

White Rock director of engineering and municipal operations Jim Gordon told PAN Monday that the Surrey contractor was set to start in August, but there was other construction activity in the area.

“We asked that they wait until that finished, which was some time ago. There’s no reason why they can’t be going now,” Gordon said.

RELATED: Surrey to build pedestrian crosswalk at 16 Avenue and 152A Street

Gordon indicated there are a number of complexities with permitting multiple unrelated construction projects to take place in the same area at the same time

“You want to make sure there’s only one contractor in the area and that contractor can take responsibility for the traffic control, pedestrian control and WorkSafe. If you have contractors overlapping, you know, it can be unclear as to whose jurisdiction the project is,” Gordon said.

Lewis said she blames the City of White Rock for the delay.

“I’m finished with this, I don’t care anymore. Because if I have to stand there in the middle of the road and stop the traffic when I go across there again, then that’s what I’ll do,” Lewis said.

Tuesday morning, Lewis told PAN that Gordon phoned her to explain the delay, and said that the plan is to have the crosswalk built by spring 2020, weather permitting.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

B.C. firefighters only responding to most life-threatening calls during COVID-19 pandemic

The directive comes after province spoke with paramedics, fire services, according to top doctor

33-storey highrise proposal coming to Surrey council, first of three phases

Second and third phases include 36-storey and 31-storey towers

Surrey city council moving to virtual meetings

For public hearings, people can register to speak via telephone

‘An extra $220 every 90 days’: B.C. patients pay more dispensing fees due to prescription limits

Kelowna woman says it’s outrageous to charge for refills every 30 days

COVID-19: Daily update on the pandemic in Surrey, White Rock, Delta and beyond

APRIL 4: Two people in Delta fined for trying to re-sell N95 masks

Education, not enforcement: B.C. bylaw officers keeping a watch on physical distancing

A kind word, it turns out, has usually been all people need to hear

Emergency aid portal opens Monday, cash could be in bank accounts by end of week: Trudeau

Emergency benefit will provide $2,000 a month for those who have lost their income due to COVID-19

QUIZ: How much do you know about hockey?

Take this test and find out how well you know Canada’s most popular winter sport

Researchers look at humidity as a weapon in the fight against airborne viruses

Regular hand washing, physical distancing and PPE for health care workers remains best line of defense

Exercises move online with YMCA’s new nationwide virtual workout program

YThrive Home offers dozens of free workout videos for people during COVID-19 self-isolation period

Two inmates found positive for COVID-19 at Mission Institution; two other tests pending

15 staff self-isolating waiting results, says correctional officer

B.C. community service provider hosts friendly art competition for youth

Theme for Pacific Community Resources contest is ‘finding the silver lining in difficult times’

Critic, workers’ group ‘disappointed’ Trudeau chose Amazon to distribute PPE

Amazon Canada said in an email to The Canadian Press that it is working with Canada Post, Purolator

Most Read