The Port Mann Bridge opened in late 2012

Travel time signs to spur Highway 1 drivers to pay tolls (with video)

Digital displays underscore time savings for those who pay to cross Port Mann Bridge



Eight overhead digital message signs along Highway 1 in Metro Vancouver now display live travel time estimates to key points along the corridor.

By showing what are usually shorter travel times over the tolled Port Mann Bridge, government officials hope more drivers will pay up and stop taking an alternate free route across the Fraser River.

“This travel time information will reinforce the benefits of the Port Mann Bridge and confirm what many drivers already know – they’re saving significant time by choosing Highway 1,” Transportation Investment Corp. president Irene Kerr said.

Transportation ministry officials say travel time surveys show regular Port Mann users save 40 minutes a day – more than three hours a week – compared to compared to battling traffic through New Westminster to take the untolled Pattullo Bridge.

A ceremony staged Thursday officially ended construction of the $3.3-billion Port Mann/Highway 1 project.

“Without the builders and visionaries behind the Port Mann / Highway 1 project, drivers would still be bumper-to-bumper in Western Canada’s worst bottleneck,” Stone said, thanking workers for their efforts and drivers for their patience.

Earlier this summer, direct connection lanes opened that link Surrey and Coquitlam with no need to merge with other Highway 1 traffic.

A multi-use path also opened on the bridge giving cyclists a new route across the Fraser River (see video below.)

The new toll bridge opened in December of 2012, but lane construction continued since then along the freeway corridor.

Registered drivers of standard vehicles initially paid $1.50 to cross the bridge thanks to an introductory half-price discount. But the $3 base tolls kicked in a year later, and they were raised to $3.15 per crossing this summer.

Despite the touted travel time savings, the number of drivers paying to cross the bridge has not met the province’s initial forecasts, and the TI Corp.’s annual operating losses have climbed above $100 million a year.

Traffic counts over the Port Mann actually fell 3.9 per cent last year, but are running five per cent higher so far in 2015.

TI Corp. officials insist they expect tolls to pay off the project costs on schedule by 2050.

The old Port Mann Bridge is still being dismantled and that work is to be finished later this fall.

Just Posted

Surrey mayor removes Councillor Pettigrew from Metro Vancouver board

Pettigrew said it was a surprise; McCallum didn’t provide a reason

VIDEO: Surrey RCMP supporters make noise during rally outside city hall

‘Keep the RCMP in Surrey’ leader Ivan Scott says municipal force ‘not a done deal’

International South Asian expo pitched for Surrey’s Bear Creek Park

Mayor Doug McCallum says the idea ‘shows a lot of promise’

Music, speeches planned for grand reopening of White Rock’s pier

Family event set for noon to 5 p.m. Sept. 21

White Rock council declares disapproval of ride-hailing rules

City to submit resolution to UBCM, send letter to B.C. Passenger Transportation Board

VIDEO: Liberals make child care pledge, Greens unveil platform on Day 6 of campaign

Green party leader Elizabeth May unveils her party’s platform in Toronto

Boy overdosed on illicit anti-anxiety drug found on Kelowna classroom floor, RCMP say

Noah Mills, 8, ingested a pink powdery substance off his Kelowna classroom floor

Fewer trees, higher costs blamed for devastating downturn in B.C. forestry

Largest driving factor is the province’s complex stumpage system that results in high fees, expert says

20 day search for missing Labradoodle in Princeton, B.C. ends with tears of joy

The search brought out bloodhounds, and groups hoping to find Mordy

Canucks sign Brock Boeser to three-year, US$17.6-million deal

Young sniper will be in Vancouver Tuesday

B.C. forest industry looks to a high-technology future

Restructuring similar to Europe 15 years ago, executive says

RCMP conclude investigation into 2017 Elephant Hill wildfire

Files have been turned over to BC Prosecution Service

Most Read