Undersea cable pitched for clean energy

A company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids

Wind farm development in northeastern B.C. Proponents of a new power line between Vancouver Island and Washington say it would make wind power a more stable source.

VICTORIA – With BC Hydro struggling to control electricity rate increases and cutting back on private power acquisition, a company known mostly for wind projects is reviving a proposal to connect the Vancouver Island and Washington electricity grids.

Sea Breeze Power Corp. wants to build a 50 km transmission cable under the Strait of Juan de Fuca to connect substations near Port Angeles and Victoria. To finance the project, it’s looking for a 10-year deal to assemble surplus U.S. power and sell it to BC Hydro at a flat rate of $69 per megawatt hour.

Sea Breeze CEO Paul Manson said the power purchase would finance the construction of the cable and deliver a steady source of electricity to B.C. at lower cost than new sources built in the province. It would also improve power quality and reliability for Vancouver Island residents, he said.

First proposed in 2006, the project has received environmental permits from both sides of the border. It was rejected by the B.C. Utilities Commission, which approved upgrading the existing power line from the B.C. mainland to Vancouver Island instead.

Sea Breeze developed a wind project at Cape Scott on northern Vancouver Island, and has plans and permits for other wind sites on the B.C. coast and the Peace River region. Manson said the Juan de Fuca cable would stabilize wind power supply on the B.C. coast, where wind speeds peak in winter, with inland Washington sites where it’s windiest in summer.

Manson said U.S. policy led to major wind development that leaves the the Pacific Northwest with an excess of power in spring, meaning the Washington power utility has paid BC Hydro to take its excess when hydro dams are full.

The cable would also give B.C. more capacity to buy cheap overnight coal and nuclear power from the U.S., which BC Hydro already does with its main connecting line along Interstate 5, he said.

Energy Minister Bill Bennett said the Juan de Fuca cable is one of many proposals that came forward as BC Hydro developed its integrated resource plan. That plan estimates that with conservation and efficiency improvements in B.C., the province will need more electricity supplies within eight years.

The company has not yet demonstrated that it can assemble the firm electricity it proposes to sell, and the project has “a pretty steep slope to climb,” Bennett said.

 

Just Posted

PHOTOS: Surrey Community Leader award winners revealed

Ten outstanding representatives of Surrey’s vibrant community took home trophies Tuesday night

Surrey football teams in Subway Bowl playoff hunt this week

Lord Tweedsmuir Panthers play at BC Place Stadium on Saturday, Nov. 16

MINTY: No magic wand to create ’70s-themed ‘Cinderella’ panto in Surrey

Cast, crew and directors work hard to bring musical show to arts centre stage, starting Nov. 27

White Rock to ‘embark on a new direction’ for city’s management

Dan Bottrill has been the city’s chief administrative officer since 2012

Five free Christmas movies in Surrey on Cineplex ‘Community Day’ for charity

Donations encouraged on the morning of Saturday, Dec. 7

‘We love you, Alex!’: Trebek gets choked up by ‘Jeopardy!’ contestant’s answer

The emotional moment came in Monday’s episode when Trebek read Dhruv Gaur’s final answer

Birthday boy: Pettersson nets 2 as Canucks beat Predators

Vancouver ends four-game winless skid with 5-3 victory over Nashville

Judge rejects Terrace man’s claim that someone else downloaded child porn on his phone

Marcus John Paquette argued that other people had used his phone, including his ex-wife

Petition for free hospital parking presented to MP Jody Wilson-Raybould

What started as a B.C. campaign became a national issue, organizer said

Bargaining to resume in Metro Vancouver transit strike as bus driver overtime ban looms

Both sides might be headed back to the table to prevent new overtime ban

Petition to ‘bring back Don Cherry’ goes viral after immigrant poppy rant

Cherry was fired from his co-hosting role for the Coach’s Corner segment on Nov. 11.

B.C.’s high gasoline prices still a mystery, Premier John Horgan says

NDP plans legislation this month, seeks action from Justin Trudeau

Group walking on thin ice at B.C. lake sparks warning from RCMP

At least seven people were spotted on Joffre Lakes, although the ice is not thick enough to be walked on

VIDEO: Don Cherry says he was fired, not sorry for ‘Coach’s Corner’ poppy rant

Cherry denies he was singling out visible minorities with his comments

Most Read