NDP leader John Horgan and Victoria MLAs Carole James and Rob Fleming visit a townhouse project with units set aside for below-market housing, built in 1996. (TOM FLETCHER/BLACK PRESS)

John Horgan protests delay in housing reform

Christy Clark renews warning about Site C delays

NDP leader John Horgan says the rental housing shortage in B.C. can’t wait for the political showdown playing out in slow motion at the B.C. legislature, as the B.C. Liberal government looks to extend its fragile minority to at least the end of June.

In the latest of a series of campaign-style events he has continued since the inconclusive election result of May 9, Horgan targeted B.C. Liberal inaction on rental housing. At a subsidized housing project in Victoria Tuesday, Horgan said the choice of Skeena B.C. Liberal MLA Ellis Ross to take over responsibility for housing is another delay.

Ross was sworn in as minister responsible for natural gas and housing Monday, taking over from Deputy Premier Rich Coleman in a full-scale cabinet appointment for a B.C. Liberal government expected to last little more than a week when the legislature resumes sitting June 22.

“It strikes me as odd that Rich Coleman would have held onto the housing file for 15 years, and then at the 11th hour it’s passed on to a rookie MLA from the Northwest,” Horgan said. “We had a whole bunch of outstanding questions for Mr. Coleman about the practices of his team when it came to housing, and the deals they were doing with developers in the Lower Mainland.”

The NDP has pressed for a change to the Residential Tenancy Act to rein in the use of sbort-term leases by landlords, used to circumvent rent increase restrictions and impose higher rents in a new lease. They say a near-zero rental vacancy rate in Metro Vancouver and southern Vancouver Island has produced a variety of tactics to increase rent, including eviction of tenants for minor renovations that also allow a new rental rate.

“When you have landlords that put a coat of paint on an existing building and jack up the rent, that’s the fundamental problem,” Horgan said.

Premier Christy Clark, meanwhile, has renewed her request to Horgan to clarify what the pending NDP-Green alliance will do with the Site C dam project on the Peace River in northeast B.C.

In her second letter to Horgan, released Tuesday, Clark says she has asked B.C. Hydro to extend the lease by another two weeks to mid-July on two homes that are in the way of a road construction project.

“The tender for this road construction portion of the project is scheduled to be released this week, with the bridge construction tender to follow shortly,” Clark wrote.

BC Hydro executives presented their timeline at a briefing in Victoria last week, describing a “domino effect” from the road and bridge realignment that would trigger a year-long delay in river diversion works. That delay would produce cost overruns totalling $630 million, BC Hydro estimates.

Just Posted

Setting the stage for emerging performers

Variety fundraiser and ongoing open-mics showcase local talent

Four Surrey students head to New Brunswick for Canada-wide science fair

Three projects move to nationals following regional fair at KPU

Surrey resident says proposed apartment building is a ‘monstrosity’ in Whalley neighbourhood

Philip Galbraith says he voted for Safe Surrey Coalition to ‘slow down development’

Man ‘seriously’ injured in crash after driving wrong way on Highway 17: Surrey RCMP

Police say the sedan hit a transport truck, then another car

Easter ‘eggstravaganza’ event planned for South Surrey

Event is to run from 12-3 p.m. at Dufferin Park (17355 2 Ave.).

VIDEO: Alberta man creates world’s biggest caricature

Dean Foster is trying to break the world record for a radio show contest

B.C. RCMP receive application for Police Cat Services

RCMP announced the launch of the Police Cat Services unit as an April fools joke

Rats available for adoption in Vancouver

In a social media post the City of Vancouver says you can adopt a rat for $5.

Kirkland Signature veggie burgers recalled due to possible metal fragments

Recalled products came in 1.7 kg packages with a best before date of Apr. 23, 2019

Chaos at the ferry terminal for people heading from Vancouver to the Island

Easter crowds create backlog at Tsawwassen ferry terminal

Parents of 13 who tortured children get life after hearing victims

One of their daughters fled their home and pleaded for help to a 911 operator

Crews battle Burnaby blaze; 2 people sent to hospital

Emergency Support Services helping residents displaced by fire

Flooding, climate change force Quebecers to rethink relationship with water

Compensation for victims of recurring floods limit to 50% of a home’s value, or a maximum of $100,000

Storms blast South, where tornadoes threaten several states

9.7 million people in the Carolinas and Virginia at a moderate risk of severe weather

Most Read