EVAN SEAL / THE LEADER Leanne Husdon Hopkins (front) along with other residents in her Fleetwood neighbourhood near 78 Avenue and 156-168 Streets

Taking a stand against a new trail

Fleetwood residents worry a greenway path will increase crime in the area.

The quiet greenspace beside her home is about to change into a thoroughfare of bicycles, partiers and criminals looking for property to steal, she fears.

Fleetwood resident Leanne Husdon Hopkins says her neighbourhood already has its share of crime and thinks it’s only going to get worse if the city forges ahead with the Fleetwood leg of its greenway plan.

For Husdon Hopkins, it will mean a multi-purpose pathway, which is planned along 78 Avenue from about 156 to 168 Streets, will brush right up against the side of her home.

What was once a quiet FortisBC right-of-way will now be a freeway of foot traffic and cyclists, she says.

Husdon Hopkins was initially told it would be a bike path, but the proposal has now expanded it into a multi-purpose pathway.

She’s talked with people who live further away where a greenway already exists, and they painted an ugly picture of what’s heading her way.

“Their fences get kicked in, they get spray painted, they have drug use going on down there, they’re not policed,” Husdon Hopkins said Tuesday.

She is in contact with about 45 homeowners along the proposed greenway and says the city is in for a fight if it forges ahead.

Surrey held a public consultation meeting at the Fleetwood Recreation Centre in December last year as it planned to move forward, but decided to hold off on the work after several concerns were raised by residents, according to Surrey’s manager of transportation Jaime Boan.

Husdon Hopkins says some of the concerns could be mitigated by placing some hedging or plants between her home and the pathway.

However, Boan says a hedge, if it grows high enough, could be create cover for the very activity Husdon Hopkins is trying to avoid.

As for dropping the Fleetwood leg of the greenway plan completely, Boan says that’s not a preferable way to go.

If that occurred, people using the greenway, including cyclists, would have to detour to 80 Avenue for a stretch, which wouldn’t be as desirable – or safe – for users, Boan says.

The Fleetwood pathway is one small portion of a large greenway master plan which will connect parks and greenspaces with pathways throughout the city.

The city has already built 75 kilometres of the 350 kms of planned greenways throughout Surrey. The city is currently constructing the connectors at a rate of about four kilometres per year.

The Fleetwood link will connect with the Surrey Lake Greenway at 156 Street and the Coast Meridian Greenway along 168 Street.

Another community consultation meeting is being scheduled for Nov. 15 from 6-8 p.m. at William Watson Elementary School, 16450 80 Ave.

kdiakiw@surreyleader.com

Just Posted

Grieving South Surrey mom ‘disappointed’ province not moving quicker to fix recovery homes

Min. Judy Darcy says new regulations, effective Dec. 1, follow ‘many horror stories’

Potters’ House of Horrors sets date for opening weekend in Surrey

The ‘Death Valley Motor Inn’ is an all-new haunted house this year

North Delta MLA Ravi Kahlon cleared of conflict allegations

Commissioner finds MLA’s father’s taxi licence doesn’t equal a conflict of interest while working on ride-sharing regulations

Surrey school district unveils its first rainbow crosswalk

Superintendent Jordan Tinney says colour crossing ‘a statement that everyone is welcome in Surrey’

Date set for complete closure of North Surrey Recreation Centre

Users will be directed to programs and services within a four-kilometre radius of the site

Pickle me this: All the outrageous foods at this year’s PNE

Pickled cotton candy, deep-fried chicken skins, and ramen corndogs are just a start

New study suggests autism overdiagnosed: Canadian expert

Laurent Mottron: ‘Autistic people we test now are less and less different than typical people’

B.C. father tells judge he did not kill his young daughters

Andrew Berry pleaded not guilty to the December 2017 deaths

Trans Mountain gives contractors 30 days to get workers, supplies ready for pipeline

Crown corporation believes the expansion project could be in service by mid-2022

Mammoth sturgeon catch was ‘a fish of a lifetime’ for Chilliwack guide

Sturgeon was so enormous it tied for largest specimen every tagged and released in the Fraser

Fraser River sea bus proposed to hook into TransLink system

Maple Ridge councillor just wants to start discussion

Rosemount cooked diced chicken linked to listeria case in B.C.

The symptoms of listeria include vomiting, nausea, fever, muscle aches

B.C. seniors allowed more choice to stay in assisted living

Province doesn’t need to wait for a complaint to investigate care, Adrian Dix says

Most Read